Screws & Glues Remodeling

A LOOK INSIDE

Real homes.
Thoughtful improvements.

A selection of kitchen, bath and interior work. Every project starts with the people who live in the space and the way they want it to work.

White cabinetry and a blue island in the kitchen.

KITCHEN REMODELING

A kitchen made for everyday life

White cabinetry and a blue island define this kitchen remodeling and cabinetry project.

Cabinetry and island

The photo shows the white cabinetry and contrasting blue island together, with a view of how the two elements sit within the kitchen.

Flooring, recessed lighting and trim in the renovated interior.

INTERIOR RENOVATION

A fresh start, from the floor up

This interior renovation brings flooring, recessed lighting and trim together in one finished space.

Flooring, lighting and finishing

This view shows the floor alongside the recessed ceiling lights and trim, highlighting the finishing details of the interior update.

Lithia bathroom: double vanity, stone countertop, arched mirrors and tile flooring.

BATHROOM REMODELING · LITHIA

A refreshed bathroom in Lithia

This Lithia bathroom update features a double vanity with a stone countertop, paired arched mirrors and tile flooring.

Vanity and floor details

The photo brings the vanity, countertop and mirrors into the same view as the tile floor, showing the bathroom’s fixtures and finishes together.

RECENT CASE STUDIES

Recently completed work in Tampa

Two recent projects, described by the scope of work completed. Details are kept general to respect each homeowner’s privacy.

Tampa kitchen-and-bath remodel: the completed kitchen cabinetry, countertops and sink.

KITCHEN & BATH REMODEL

A coordinated kitchen and bath update

  • Tampa, FL
  • Completed July 2026
  • Permit final passed

This project moved from a full demolition through finish work and final inspection, with the kitchen and bathroom sequenced together as one coordinated update.

Demolition & rough work

  • Removal of existing cabinets, shower, toilet, vanity and drywall
  • Plumbing and electrical modifications
  • Framing re-supported as needed
  • Breakfast bar removed

Bathroom

  • Shower waterproofing with a successful pan test
  • Shower tile installation, grout and caulk
  • Vanity, toilet and bathroom flooring
  • Bathroom fan, lights, outlets, grab bar and bench

Kitchen

  • Kitchen drywall and painting
  • Base cabinets, cabinet installation and trim

Finish & closeout

  • Countertops, vanity mirror and faucets
  • Final permit inspection passed

BATHROOM FLOORING & TILE REPAIRS

New floors across two bathrooms and two closets

  • Tampa, FL
  • Completed June 2026

A focused flooring and tile repair project, not a full bathroom remodel. Existing floor materials were removed down to the concrete, the slab was prepared, and new customer-selected tile was installed, with targeted plumbing and drywall work to finish the job.

Floor prep & tile

  • Removal of existing floor materials in two bathrooms and two closets
  • Concrete scraping, cleaning, patching and prep
  • New customer-selected tile floors
  • Wall tile replacement in the second bath

Fixtures & repairs

  • Two new Kohler Highline Arc elongated chair-height toilets
  • New supply lines and a customer-supplied closet flange
  • Drywall repair at four plumbing openings
  • Jobsite protection, debris removal and cleanup

PLANNING A CHANGE AT HOME?

Let’s make a plan for your space.

Tell us what you’re hoping to improve, and we’ll help identify a good next step.